2.3
bulkheads
note:
Bulkhead covers need to be removed before
beginning installation.
A.
Connect the main burner gas fl ex line and the
pilot line to the gas fi ttings on the bulkheads
located under the valve access opening.Care
must be taken to ensure the pilot line isn't
damaged and ensuring gas tight connections
are made.
B.
Connect the pilot electrode lead to the
bulkhead matching the 3/16" fl ag with the
3/16" bulkhead spade. Do the same with the
1/4" spark lead to the 1/4" bulkhead spade.
C.
Ensure the venturi tubes are over the orifi ce
before lighting.
D.
Check for gas leaks by brushing on a soap
and water solution. Do not use open fl ame.
E.
After leak test has been performed re-install
access panel with gasket.
installation
Main
Burner Gas
Connection
Pilot Tube
Gas Connection
Bulkhead
Pilot
Electrode
Lead
W415-2746 / A / 11.04.19
EN
3