Télécharger Imprimer la page

Fluidmaster PerforMAX 400H Guide D'installation Rapide page 5

Publicité

Les langues disponibles

Les langues disponibles

STEP 3:
A: TWIST FILL VALVE TO ADJUST HEIGHT
Top of fill valve cap should measure roughly 3"
above top of overflow pipe when installed.
NOTE:
Increasing height allows
more water to fill in the tank.
*Lever Hole
*
The top of the overflow pipe must be a minimum of 1" below tank lever hole.
ADJUST HEIGHT OF NEW FILL VALVE
TWIST
LEFT
Fill Valve Cap
HOLD
Do Not Move Lock Ring
TOP OF FILL VALVE CAP
3"
TOP OF OVERFLOW PIPE
Overflow Pipe
5

Publicité

loading