REPLACING THE FUSES
WARNING: To avoid electric shock, disconnect the test leads from any source of voltage before
removing the back cover
1
Disconnect the test leads from the meter and any item under test.
2
Open the back cover by loosening the screw on the back cover using a Phillips head screwdriver.
3
Remove the old fuse from its holder by gently pulling it out.
4
Install the new fuse into the holder.
5
Always use a fuse of the proper size and value (0.2A/250V fast blow for the 200mA range,
20A/250V fast blow for the 10A range).
6
Put the back cover. Insert the screw and tighten it securely.
WARNING: To avoid electric shock, do not operate your meter until the fuse door is in place and
fastened securely.
Declaration of conformity (CE)
The product 1760 B is in conformity with EMC directive 2004/108/EC emanated from the Com-
mission of the European Community.
Beta 1760 B.indd 44
21-05-2010 15:11:21