Télécharger Imprimer la page

Zephyr Essentials Tempest II AK7500BS Guide D'utilisation, D'entretien Et D'installation page 16

Publicité

Les langues disponibles

Les langues disponibles

Follow Steps 1 through 4 on page 13, then continue PBD-1200A horiztantal ducting installation by following the
steps below.
5. Knock out plate A for dual blower horizontal
ducting.
7. From inside hood body, position top cover plate
to top of hood body. From outisde hood body,
attach top cover plate to top of hood body using
A
6. Position dual blower inside hood body. Attach by
8. Attach 10 inch round blower collar to back of
wire extension cable to new blower and connect
both plugs from each blower to female plugs
behind switch panel.
14
www.zephyronline.com

Publicité

loading