Zephyr Siena Pro Island ZSL-E42CS Guide D'utilisation, D'entretien Et D'installation page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
Mounting the Hood
6. Attach collar adaptor to top of hood body by (4)
M4 x 8mm screws. Attach 10" round duct collar
to collar adaptor by (4) M4 x 8mm screws. Install
electrical and duct work. Seal duct with aluminum
duct tape.
7. Power up hood, verify all functions, and check for
leaks around duct tape.
8. Assemble top duct covers (with louver holes)
together over top support frame. Secure top duct
covers together by magnetic strips.
9. Secure top duct covers to top support frame by
using (4) 3/16 x 1/4 screws (2 screws for each top
duct cover) (FIG. H1).
10. Assemble bottom duct covers together over top
duct covers and secure together by magnetic
strips. Bottom duct c overs should rest on top of
the hood body.
16
Top Support Frame
Top Duct Covers
Bottom Duct Covers
Bottom Support Frame
Siena Pro Island Use, Care, and Installation Guide
S I E N A P R O I S L A N D
I S L A N D
1
FIG. H
C O R E

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Siena pro island zsl-e48cs

Table des Matières