1.
According to the diagrammatic representation, the buckles (1) and (2) should be unfolded at
first,which will separate the main body and the lid.
2.
Put the draining skeps with filter medium into the main body in turn. Press the lid with your hands
to connect the main body and the lid again. Then you should fasten the buckles (1) and (2)
3.
Pull the securing buckle to take out the input and output nozzle. After this, the input and output
pipes should be installed and they will be fastened by nuts. Later, put the input and output nozzles
to their former place and press the securing buckle to fix the input and output nozzles.
4.
According to the diagrammatic representation, install the input and output curvy bar in the aquar-
ium. (Note: The curvy bar with spray bar is the output curvy bar, and the curvy bar with skimmer
is the input bar)
5.
Press the blue buckle forcibly and leave it immediately. The blue buckle will rebound and the in-
put bar absorbs water into main body at the same time which compel the air out of main body
through output bar. When the water level in the output bar is equal to the level of aquarium, you
may electrify the equipment to make it work.
6.
Things under the transparent cover are control switch of UV light and indicator light of electricity.
(Notice! Because of the life of light tube, it doesn't mean the UV light is ok when the equipment is
working. So it is necessary to check the UV light regularly).
10
Initial Use