Installation - Klarstein METROBREEZE 9 PARIS Mode D'emploi

Masquer les pouces Voir aussi pour METROBREEZE 9 PARIS:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
26

INSTALLATION

Note: SIn the moving process, ensure that the air conditioning is in the upright position
and the air conditioning should be placed on a fl at surface. Do not install and use the air
conditioning in the bathroom or other humid environments.
Install the window sealing plate assembly
1. Half open the window, and mount the window sealing plate assembly to the
window. The assembly can be placed in horizontal and vertical direction.
2. Pull various components of the window sealing plate assembly open, adjust their
opening distance to bring both ends of the assembly into contact with the window
frame, and fi x various components of the assembly.
Install the heat pipe assembly
1. Screw the heat pipe assembly (exhaust fi tting
end) into the exhaust port on the rear panel
(counterclockwise).
2. Connect the heat pipe to the window sealing
plate.
Install the body
1. Move the machine with installed heat pipe and
fi ttings before the window, and the distance
between the body and walls or other objects
shall be least 50 cm.
2. Elongate the heat pipe and snap the fl at end
of the heat pipe joints into the elliptical hole
the window sealing plate assembly.
3. The fl at end of the heat pipe joints must be
snapped into place.
4. The pipe cannot be distorted nor has substantial turning (greater than 45 °). Keep
the ventilation of the heat pipe unobstructed.
The length of the exhaust hose shall be 280~1,500 mm, and this length is based on
the specifi cations of the air conditioning. Do not use extension tubes or replace it with
other different hoses, or this may cause a malfunction. Exhaust must be unobstructed;
otherwise it may cause overheating.
of

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10034682

Table des Matières