ELECTRICAL CONNECTIONS
STEP 1:
Make the following Electrical Connections::
a. For 120/277V connect the black fixture lead to the voltage supply
or Hot 1 (for 208/240V wiring).
b. For 120/277V connect the white fixture lead to the neutral supply
or Hot 2 (for 208/240V wiring).
c. Connect the green or green/yellow ground lead to ground.
STEP 2:
Turn the ON/OFF switch on the side of the emergency driver to
ON status when installation is completed and AC power has been
supplied.
See Figure 9.
ON Switch
9
© 2020 Cree Lighting, A company of IDEAL INDUSTRIES. All rights reserved. For informational purposes only. Content
is subject to change. See www.creelighting.com/warranty for warranty and specifications. Cree
registered trademarks of Cree, Inc. SmartCast
Cree Lighting, A company of IDEAL INDUSTRIES.
4 of 4
, is a registered trademark and ZR14™, ZR22™ and ZR24™ are trademarks of
®
LINE
OR HOT 1
GREEN
NEUTRAL
OR HOT 2
NOTE: DO NOT put the switch on the side of the
emergency driver to ON until installation is complete
and AC power is supplied
and the Cree logo are
®
LUMINAIRE
LINE-BLACK
GROUND-GREEN
NEUTRAL-WHITE
www.creelighting.com
LPN00678X0004A0_B