MOUNTING THE LIGHT FIXTURE
1. Make sure wire connectors and wires are inside the
junction box.
2. Slide the fixture assembly onto the mounting screws.
Tighten decorative nuts removed in step 1 of Light
Fixture Installation section securely against fixture base.
3. Install one medium base light bulb (100 Watt maximum,
tungsten incandescent).
TESTING AND ADJUSTMENTS
Initial Setup
The TEST mode overrides the photocell (daylight shutoff
feature) and allows the light fixture to be tested day or night
when the ON-TIME switch is in the TEST position. The
light will stay on for 5 seconds after all motion has stopped.
TEST 1 5 10 MIN
Sensor Controls
Decorative Nut
Junction
Box
Mounting Screw
OFF 3 6 DUSK TO
HOUR DAWN
6
1. Turn the DualBrite control to OFF.
2. Set the ON-TIME control to TEST.
3. Turn on the circuit breaker or fuse and the light switch.
4. Allow the sensor to completely warm up (90 seconds)
before beginning the setup process.
5. Perform a walk test. Walk in an arc across the front of
the sensor.
6 ft . (1 .8 m)
Maximum Range
6. Move the sensor head left or right to change the coverage
area. Note: Grasp the sensor only as shown and turn
the entire sensor. Any other method may damage
the sensor. Do not force it past the stops.
Rotating Sensor Head to Change Coverage Area
30 ft . (9 .1 m)
Maximum
Coverage Angle
(Top View)
150°
204030-02