Télécharger Imprimer la page

Greenfire GF55 Manuel Technique page 14

Masquer les pouces Voir aussi pour GF55:

Publicité

Les langues disponibles

Les langues disponibles

installation
OUTSIDE VERTICAL INSTALLATIONS
To accomplish a outside vertical pipe installation, follow steps 1 through 5
in the "Inside Vertical Installation" section and then finish it by performing
the following (refer to Figure 16).
1. Install a tee with clean out on the outside of the house.
2. Install PL vent upward from the tee. Make sure that you install support
brackets to keep the vent straight and secure.
3. Install ceiling thimble and secure the flashing as you go through the
roof.
4. Ensure that the rain cap is approximately 24" (610 mm) above the
roof.
Figure 16: Outside Vertical Installation.
14 | Poêle et encastrable à granules Greenfire GF55 / GFI55 - Manuel technique
All manuals and user guides at all-guides.com
Rain cap
24"
(61 cm)
Flashing
3" (7.5 cm)
Clearance
3"
(7.5cm)
Support
bracket
Tee with
cleanout
Type "L", "PL" or
all fuel vent
Fresh air
intake
HEARTH MOUNT INSTALLATION
1. Lock fireplace damper in the open position.
2. Install a positive flue connector at the fireplace dampers.
3. Connect a clean-out tee or a 90° elbow to the exhaust pipe.
4. Install flexible stainless steel liner or listed pellet vent to the top of the
chimney.
Clean-out
Fresh-air intake
should com from
chimney. If holes
already exist
fresh-air intake can
be taken through
back of the fireplace
or through
Masonry Fireplace
the ash dump.
Figure 17: Hearth Mount - Side View.
Damper Removed
or Fastened Open
Mantel
Minimum 8" (20 cm)
from top of stove
Min 6"
(150 mm)
Floor
Protection
Combustible Floor

Publicité

loading

Produits Connexes pour Greenfire GF55

Ce manuel est également adapté pour:

Gfi55