Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Setup

Note: Shoes, follow bars, and saddles marked
"EMT" are for EMT conduit only. Parts marked
"Rigid/IMC" are for rigid and IMC conduit,
and Schedule 40 pipe.
Loading Conduit
Ready to Bend
Completed Bend
Greenlee / A Textron Company
882 and 882CB Hydraulic Benders
1. Mark the conduit. See the instructions under
"Laying Out Bends" in this manual.
2. Select the bending shoe, follow bar, and saddle that
correspond to the size and type of conduit.
3. Remove the locking hitch pin from the roller unit.
Lift the hinged upper connecting plate. Remove the
yoke pin from the yoke.
4. Position the shoe, lettered side up, so that the 1"
diameter hole is in the yoke slot. Align the 1" shoe
hole with the yoke hole that is:
• farthest from the ram when using the 1-1/4" and
1-1/2" shoe
• closest to the ram when using the 2" shoe
5. Insert the yoke pin through the yoke and the shoe.
6. Place the follow bar, with legs down, over the lower
connecting plate.
7. Place the conduit into the follow bar. Slip the saddle
over the conduit and pin the saddle to the shoe with
the saddle pin.
8. Lower the upper connecting plate over the roller pin
and replace the locking hitch pin.
9. Align the bending mark on the conduit with the
outside edge of the saddle. Be sure that the pins for
the yoke and saddle are fully engaged.
10. Connect the high-pressure hydraulic hose to the
ram and to the pump.
Note: Clean the quick-change couplers before
making connections. Hand-tighten the couplers com-
pletely. Do not use tools.
Follow the instructions and safety information
supplied with your hydraulic pump.
5
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Greenlee 882cb

Table des Matières