Installation; Installation Checklist; Mounting - Fronius Smart Meter 240V-3 UL Instructions De Service

Masquer les pouces Voir aussi pour Smart Meter 240V-3 UL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Installation
See the sections referenced below for installation details
Checklist
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Mounting

The Fronius Smart meter has two mounting holes spaced 5.375 in. (137 mm) apart (center-
to-center). These mounting holes are normally obscured by the detachable screw termi-
nals. Remove the screw terminals to mark the hole positions and mount the meter.
Self-tapping sheet metal screws are included. Do not over-tighten the screws, as long-term
stress on the case can cause cracking.
Turn off power before making line voltage connections
Mount the Fronius Smart Meter (see Mounting on page 9)
Connect circuit breakers or fuses and disconnects (see Circuit Protection on page 10)
Connect the line voltage wires to the meter's terminal block (see Line Wiring on page
10)
Mount the Current Transformers (CTs) around the line conductors. Make sure the CTs
face the correct direction. An arrow might indicate either the load or the source (public
grid) (see Connect Current Transformers on page 13)
Connect the twisted white and black wires form the CTs to the terminal block on the
meter, matching the wire colors to the white and black dots on the meter label (see CT
Wiring on page 14)
Check that the CT phases match the line voltage phases (see Connect Current Trans-
formers on page 13)
Record the CT rated current for each meter, because it will be required during setup
Connect the output terminals of the Fronius Smart Meter to the monitoring equipment
(see Connecting the Data Communication Signals to the Fronius Inverter on page 14)
If necessary set terminating resistors (see Terminating Resistors on page 15)
Check that all the wires and plugs are securely installed in the terminal blocks by tug-
ging on each wire
Turn on the power to the Smart Meter
Verify that the LEDs indicate correct operation. If there is a consumption of power and
all generated power sources are turned off, then the LEDs from the used phases
should flash green (see Power Status LEDs on page 17).
Check your Fronius System monitoring software. In order to ensure compatibility be-
tween the inverter and the Smart Meter, software must always be kept up-to-date. The
update can be started via the inverter website or via Solar.web.
Set CT-Ratio and Grid Type on the web interface of the Fronius Datamanager in Set-
tings - Meter - Settings (see Configuration Web Interface on page 16)
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Smart meter 480v-3 ulSmart meter 600v-3 ul

Table des Matières