Taking into operation
Safety notes:
- Installation must be carried out by an electrician in compliance with the latest codes and regulations.
- Danger: High voltage may be present.
- Prior to opening, it must be ensured that no voltage is applied to the device.
- Before electrical connection, the supply voltage on the type plate is to be checked. The wrong operating voltage can lead to
damages or to the destruction of the equipment.
- During installation it must be ensured that the connection cables are secured against tension and distortion.
Please observe: The devices are not designed for portable use.
- CAUTION: When making installation, route field wiring away from sharp projections, corners and internal components.
- The function of the unit is only guaranteed if the upper and lower section is joined correctly.
- In order to prevent detriment to sight, continuously looking directly in the activated light is to be avoided.
Opening the housing
1.
2.
3/8
The unit is not closed when delivered.
Sealing plugs for the housing screws are available as accessories.
Electrical connection:
Connecting cables:
Option –SSM (Soft-Start-Module) (24V DC only):
- Limiting of the switch-on current peak to max. 2.1A
- Connection of the operating voltage to the equipment starts at >7V
- Resistance for the line monitoring connected.
Operating voltage range: 18V – 30V DC
Connection of a resistor
for line monitoring:
Cable gland entries
To guarantee the specified protection type,
cable grommets with a protection type of
IP 66 are to be installed at the openings pro-
vided for this purpose. The supplied dia-
phragm nipple can be replaced with a cable
gland or with an M12 plug connection with a
flange measurement of M20.
Maintenance, Service and Ordering Spare Parts
The device does not require any special maintenance. External cleaning should be done with a mild soap solution without
the use of solvents. The device may only be operated in the undamaged state within the specified rating.
Conversions, alterations, improper and inadmissible use as well as the non-observance of the notes in these operating in-
structions shall render the warranty null and void.
Components may be replaced only by original spare parts. As a matter of principle, repairs are to be carried out in the manu-
facturing works.
085 501 949p
By loosing the four cover
screws, the upper section
can be removed.
Circuit board for electrical
connection (located in the
base section):
Resistor for line monitoring (1KOhm) at terminal for operating voltage
Position of resistor in last device when using several beacons in parallel
Remove resistors that are not needed
.
IP 66 only when funnel of
membrane is pointing
outward.
After installation of the cable
remove the remains of the
diaphragm.
Closing the housing
1.
3/8
Connection for
Operating voltage
X1
Diaphragm nipple IP 66
(provided)
30320-004p
2.
The housing is closed by
turning the cover screws to
the limit position until the
housing locks into place.
L
+
N
Cable gland IP 66
M12 plug connector IP 66
(for low voltage versions)
4