Zeiss SYCOP 3 Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
SYCOP 3
INSTALLATION CONDITIONS
ZEISS
8
INSTALLATION CONDITIONS
The installation conditions for SYCOP3 correspond to those of the microscopes assigned to them:
SteREO Discovery.V12/V20, SteREO Lumar.V12, Axio Zoom.V16.
The ambient conditions (humidity, temperature, pressure) specified in Section 7 should be adhered to.
When documenting fluorescence preparations, do not expose the microscope to direct sunlight. This
helps minimize the influence of stray light.
For prolonged experimental procedures using the microscope (e.g. involving incubation or long image-
recording procedures) choose an installation location with minimum vibration.
Vibration stemming e.g. from forced ventilation, floor impact noise or other shocks can have an impact
on the supplementary modules of the microscope, some of which react sensitively. It can also lead to
reduced image quality and experimental errors.
To reduce vibrations at the microscope installation location, ZEISS offers various passive and active
damping options (Axio Imager (000000-0477-190 anti-vibration plate); small, air-damped system table
(000000-1984-812), table top mat TS 150).
Select an installation site which is as temperature-stable as possible for long-term observations.
For reliable long-term observations, the device must first warm up. The temperature equilibrium is
attained within 2-3 hours, depending on the light source, electronics and room temperature control. This
time must be planned into critical studies.
Space requirements
The distance of the system to the wall should be at least 15 cm, in order to ensure sufficient air
circulation and accessibility of the cabling..
09/2017
435611-6044-008
7

Publicité

Table des Matières
loading

Produits Connexes pour Zeiss SYCOP 3

Table des Matières