KPS -MT10 Manuel D'instructions page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

KPS-MT10 • Digital multimeter
tors before applying test leads.
4. When measuring resistance above 1 MΩ the meter will
take a few seconds to get stable reading. It is normal for
high resistance mesurement.
Diode test
1. Set the function switch at
position.
(Note: The polarity of red lead is positive "+").
2. Connect the red test lead to the anode of the diode to
be tested ond the black lead to the cathode of the diode.
3. The approx. forward voltage drop of the diode will be
displayed. If the connection is reversed, only figure "OL"
will appear on the LCD display.
Audible continuity test
1. Set the function switch at
position.
2. Connect test leads to two points of the circuit to be
tested.
Data hold application
HOLD button is used to hold a measuring result. When
this button is pushed, LCD will keep the last reading until
pushing this button again or rotating the function switch.
6.
MAINTENANCE
Battery & fuse replacement
If the sign "
" appears on the LCD display, it indicates
that the battery should be replaced. Remove the screw
on the back cover and open the case. Replace the ex-
hausted batteries with the same types.
Fuse rarely need replacement and blow almost always
as a result of operator's error. Open the case and replace
blown fuse with same ratings.
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mt10602250005

Table des Matières