installation
EN
2.3
framing
Prepare rough in framing following the recommended dimensions in Figure 1. For the corner rough in framing,
follow the recommended dimension in Figure 2.
Select a location that is not prone to moisture and is located at least 36" (914mm) away from combustible
materials such as curtain drapes, furniture, bedding, paper etc.
Fig. 1
A
NEFB24HG
A
9" (229mm)
B 23" (584mm)
17 1/4"
C
(438mm) + F
41"
J
(1041mm)
K 29" (736mm)
29" (736mm)
L
10
W415-1662 / C / 07.20.20
FLOOR
(Or mantel base thickness)
F
B
NEFB27HG
NEFB29HG
10" (254mm)
10" (254mm)
26" (660mm)
28" (711mm)
18 1/4"
19 3/4"
(463mm) + F
(502mm) + F
44" (1118mm)
46" (1168mm)
31 1/2"
32 1/2"
(800mm)
(826mm)
31 1/2"
32 1/2"
(800mm)
(826mm)
A
B
J
Fig. 2
C
Once the rough opening has been
A.
prepared, and the power has been
routed to the right side of the recess, the
appliance may be installed.
The electrical connection must be
B.
made prior to placing the appliance
into position. (See "HARD WIRING
INSTALLATION" section).
B
L
K
B
J
C
L