IMEON HV
6. Decommissioning
6.1.
Remove the Inverter
1. Disconnect PV, battery, AC Grid and AC Backup (EPS) connectors
2. Disconnect the ground cable from the inverter
3. Disconnect communication and optional connection wiring.
4. Wait for 5 minutes for de-energizing.
5. Remove the 4 inverter support screws from the wall plate.
6.2. Packaging
Please pack the inverter with the original packaging.
6.3. Storage and Transportation
Store the inverter in a dry environment where ambient temperature keeps always between
-20 °C - +60 °C.Take care of the inverter during the storage and transportation, and keep
less than 4 cartons in one stack.
When the inverter or other related components need to be disposed,have it carried out
according to local waste handling regulations. Please be sure to deliver wasted inverters
and packing materials to certain site, where can assist relevant department to dispose and
recycle.
IMEON HV – Guide d'installation / Installation guide – Rev A.4
FR
EN
FR
67