Panasonic MKG1500-DE Consignes D'installation page 16

Unité de mesure électrique
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

For Solar PV or Storage Battery Measurement
(Requires separately sold CT Cable Set (MKG1510-DE , Optional item))
* When adding to an existing system, switch the main breaker and power connection breaker OFF before installing.
(1) Pass the CT cable and connect it to the CT connector labelled "PV" for measurement of a solar PV system or
the connector labelled "SB" for measurement of a storage battery system, after removing the cover.
(2) Check the phase of the breaker connected to the solar PV or battery being measured, and connect and install
install the CT to I1, I2 and I3 on the CT cable so that they connect to V1, V2 and V3 on the power wire.
To attached multiple solar PV or storage battery systems
The diagram below shows how to combine wiring to measure multiple systems. If such connection sites are not
available, only a single system can be measured. Additionally, measurement will not be possible if the rating is
exceeded (63 A).
For 3-phase 4 wire
V1
V2
V3
N
(K)
For single-phase 2 wire
V1
N
(K)
(L)
Terminal /
(K)
(L)
Breaker
(L)
I3
I2
I1
CT Cable
(K)
(L)
Terminal /
Breaker
I3
I2
I1
CT Cable
16
Solar PV
1
Breaker
Solar PV 1
Solar PV
2
Breaker
Solar PV 2
Solar PV
1
Breaker
Solar PV 1
Solar PV
2
Breaker
Solar PV 2

Publicité

Table des Matières
loading

Table des Matières