Rotary 100 Serie Instructions D'installation page 14

Masquer les pouces Voir aussi pour 100 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

E.
Air Valve Bracket (when used):
Remove motor warnings decal from motor cover. Remove
motor cover screws. Place air valve bracket on top of motor
cover so that the raise switch protrudes through the hole
in the air valve bracket. Mount air valve bracket and motor
cover with the existing single phase (4) M5 x 15 PHMS motor
cover screws or supplied M5 x 50 PHMS for three phase, Fig.
22.
F.
Attach enclosed NP280 decal ("PUSH TO RELEASE LATCHES")
and NP864 (LIFT CAPACITY) below button on bracket, Fig. 22.
Run 1/4" air line from air valve to the slot in the fixed runway.
Cut airline and attach a Tee, Fig. 25, 22.
G. Run 1/4" air line from the Tee in the front yoke through air
output on the air valve, Fig. 22, and Fig. 25.
H. If lift has internal air, remove plug in reducing tee and con-
nect the 3/8" line coiled inside of runway, Fig. 22.
I.
Check for air leaks by depressing air valve. Repair as re-
quired.
Fig. 25
Y Fitting
Union
1/4" Air Line in Runway
RUNWAY AIR LINE
J.
Use provided cable ties to tie air line to hydraulic hose between
power unit and lift.
K. Actuate air valve and check latch operation on all four cor-
ners. The locking latches should pull in beyond yoke ends to
clear the latch bars located in all four columns, Fig. 24.
L.
Use cable ties provided to tie 3/8" air supply to electrical
supply conduit at approximately 2'-0" intervals.
Locking
Latch Bar
Locking
Latch
Fig. 24
LATCHES SHOULD CLEAR LATCH BARS
1/4" Air Line To Lift
Tee
Left Runway
14
Yoke
Cylinder
Assembly
Y Fitting

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ar14Sm14

Table des Matières