Rotary 100 Serie Instructions D'installation page 12

Masquer les pouces Voir aussi pour 100 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

13. 3ø Control Box Installation:
A. Attach Mounting Bracket to the Power Unit Bracket using (4)
5/16"-18NC x 1" Lg. Soc HD Flat C'Sink Screws, (4) 5/16" Flat
Washers, and (4) 5/16"-18NC Hex Flange Nuts, Fig. 21a.
B. Attach Control Box to Bracket using (4) 1/4"-20NC x 1/2"
HHCS, (4) 1/4" Flat Washers, and (4) 1/4" Star Washers. Fig.
21a.
C. Route cord through strain relief on motor and connect per
table on the bottom of page 11.
Note:
The contactor in the control box has a 480V coil.
For installations where the electric supply is 230V,
the coil must be replaced with the extra 230V coil
shipped with the control box. For 575V electric
supply, the coil must be replaced with the extra
575V coil shipped with the lift.
Fig. 21b
5/16"-18NC x 1" Lg.
Soc. HD Flat C'Sink Screw
1/4" Flat Washer
1/4" Star Washer
1/4"-20NC x 1/2" HHCS
5/16"-18NC Hex Flange Nut
12
5/16" Flat Washer
Fig. 21a

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ar14Sm14

Table des Matières