Klarstein NEW BREEZE Mode D'emploi page 45

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installing the Wire Hook
• Assemble the wire hook at the back of the unit with screws (the direction of wire
hook is as shown in the following fig.
• Wind the power cord around the wire hook.
Installing the Heat Discharge Pipe
1. Rotate joint A and joint B clockwise into the two ends of heat discharge pipe.
2. Insert joint A of heat discharge pipe (the side with „TOP" is upwards) into the
groove until you hear a sound.
EN
45

Publicité

Table des Matières
loading

Table des Matières