Appendix A Commissioning Report; Installer Information - Qcells Q.HOMECORE Serie Guide D'installation Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Appendix A Commissioning Report

Installer Information

Name
:
Phone
:
Address :
Commissioning Report (1/2)
Home ID (9 digits)
Q.HOME (Q.VOLT) S/N (18 digits)
Home ID (9 digits) provided to end user?
PIN Code (4 digits) provided to end user?
Server registration successfully completed?
Use precautions explained to end user?
Precautions
• If the ESS cannot remain connected to grid AC power after commissioning, the PV Switch
on the Q.VOLT and the Battery DC Switch on the Q.SAVE must be switched OFF in order
to avoid any damage to the Battery Pack.
• In case you install more than two Q.SAVEs to one Q.VOLT, make sure to plug a BMS
Communication Cable to the "OUT" terminal on the Q.SAVE for Q.VOLT connection, and
plug another cable to the "IN" terminal for the next Q.SAVE connection.
• Make sure to complete all configurations before switching ON the PV Switch and the
Battery DC Switch for safety.
Do You Have Any Comments?
Installer Signature
Date
:
Signature :
End User Information
Name
:
Phone
:
Address :
:
:
:
Yes
/ No
:
Yes
/ No
:
Yes
/ No
:
Yes
/ No
Please, go to the next page
End User Signature
Date
:
Signature :
33

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Q.homecore h4Q.homecore h5Q.homecore a4Q.homecore a5

Table des Matières