8.4 Assembling LAN & DRM Connector
Sealing Nut
Push the LAN or DRM cable through the side of the ruber seal.
8.5 Closing the Covers
Note: Before close the covers, complete the energy meter and CT
installation. Fore details about installing energy meter and CT, see "9
Energy Meter Wiring & Setting" on page 21.
1
Close the inner cover and tighten the 9 bolts.
• Bolt: M4
• Torque: 18 kgf·cm / 15.6 lbf·in
Ruber Seal
Cable OD range: 4 to 6 mm
Tighten the sealing nut.
(Tightening torque range:
5 to 15 kgf·cm)
(only for Australia)
19