Hantech 10474165 Mode D'emploi page 18

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61
labelled for that refrigerant (i.e.
special cylinders for the recovery
of refrigerant). Cylinders shall be
complete with pressure relief valve
and associated shut-off valves in
good working order. Empty recovery
cylinders are evacuated and, if
possible, cooled before recovery
occurs.
The recovery equipment shall be in
good working order with a set of
instructions concerning the equipment
that is at hand and shall be suitable for
the recovery of flammable refrigerants.
In addition, a set of calibrated
weighing scales shall be available and
in good working order. Hoses shall be
complete with leak-free disconnect
couplings and in good condition.
Before using the recovery machine,
check that it is in satisfactory working
order, has been properly maintained
and that any associated electrical
components are sealed to prevent
ignition in the event of a refrigerant
release. Consult manufacturer if in
doubt.
The recovered refrigerant shall be
returned to the refrigerant supplier in
the correct recovery cylinder, and the
relevant Waste Transfer Note arranged.
Do not mix refrigerants in recovery
units and especially not in cylinders.
If compressors or compressor oils
are to be removed, ensure that they
have been evacuated to an acceptable
level to make certain that flammable
refrigerant does not remain within
the lubricant. The evacuation process
shall be carried out prior to returning
the compressor to the suppliers. Only
electric heating to the compressor
body shall be employed to accelerate
this process. When oil is drained from
a system, it shall be carried out safely.
Fuse parameters of the machine
Type:
Voltage:
Current:
Transmission
frequency:
WIFI frequency:
WIFI transmission
power
Transmission
power:
A. Unit Storage:
1. Unscrew the drainage cover, unplug
the water plug, and discharge the
water in the water pan into other
water containers or directly tilt the
body to discharge the water into
other containers.
2. Turn on the machine, adjust it
to low-wind ventilation mode,
and maintain this state until the
drainage pipe becomes dry, so
as to keep the inside of the body
in a dry state and prevent it from
mildewing.
3. Turn off the machine, unplug the
power plug, and wrap the power
cord around the wrapping post;
install the water plug and the
drainage cover.
4. Remove the exhaust pipe and keep
it properly.
5. Cover the air conditioning witha
plastic bag. Put the air conditioning
ina dry place, keep it out of the
reach of children, and take dust
control measures.
6. Remove batteries of the remote
control and keep them properly.
Note: ensure that the body is placed
in a dry place and keep all machine
components properly.
– 18 –
5TE or SMT
250 V
3.15 A
infrared
frequency 28 Khz
2412-2472 Mhz
<20.0 dBm
802.11b: 17.5 dBm;
802.11g: 15.5 dBm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10474167

Table des Matières