Step 9. Final Installation Checklist - Samsung NX58M9420S Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation instructions
6. When one side of the food is browned, turn it over, close the oven door, and
start cooking the other side.
7. When cooking is complete, press the OFF/CLEAR pad.
Checking the flame quality:
All combustion flames need to be visually checked to determine their flame
quality.
1
2
3
24 English
Install_NX58M9420SS_DG68-00906A-00_EN.indd 24
1. Soft blue flames—Normal for natural gas
operation.
2. Yellow tips on outer cones—Normal for LP
gas operation.
3. Yellow flames—Abnormal for any gas
operation; call for service.
NOTE
If burner flame looks like 3, the range
should not be used until it is serviced. Call
for service. Normal burner flames shall look
like 1 or 2, depending on the gas type you
use.

Step 9. Final installation checklist

You have just completed installing your range. Make sure all controls are in the off
position and the flow of ventilation air to the range is unobstructed. The following
is a checklist to confirm your range is safely installed and ready for operation.
– Gas line has been properly connected to
– Range is plugged into the properly
– Approved anti-tip bracket is properly
Gas Range Plug
– Range is leveled and is firmly sitting on a
– Gas surface burners have been properly
– All burners have been tested for proper
– FOR INSTALLER ONLY—Check and/or
Locking screw
the range. The gas has been turned on. All
connections have been checked for leaks.
grounded electrical receptacle.
installed and engaged with the range.
solid, level floor.
assembled.
operation.
adjust the broil and oven burner flames as
described on pages 23-24 in this manual.
1/6/2017 6:25:54 PM

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Nx58m9420ss/aaNx58m9420ss

Table des Matières