Champion SKYBIRD TRAP Manuel De L'opérateur page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TRAP ASSEMBLY INSTRUCTIONS (continued)
STEP 3.
THROWING ARM ASSEMBLY (FIG-7).
Line-up three holes in Throwing Arm (A) with
three holes in Arm Support. Insert three 10MM
X 20MM Hex Head Bolts (N-5) from bottom
through Throwing Arm Support and Throwing
Arm. Add 10MM Flange Nut (N-10) and tighten
securely using wrenches.
STEP 4.
FLIGHT CONTROL RAIL ASSEMBLY (FIG-7).
Line-up threaded holes in Flight Control Rail
(G) with top holes in edge of Throwing Arm
(A). Attach Flight Control Rail with three Round
Head Screws (N-7). Do not fully tighten screws
until the Target Clip is installed (Step 5)
NOTE: It is normal for these screws to be
somewhat difficult to turn.
STEP 5.
TARGET CLIP ASSEMBLY (FIG-8).
After attaching the Flight Control Rail in the
previous step, slide the Target Clip (I) between
the Flight Control Rail (G) and the Throwing
Arm (A) and tighten the three screws (N-7).
STEP 6.
MAINSPRING ASSEMBLY (FIG-9)
Drop Hex Bolt (N-8), threaded end first, into Mainspring (H) through largest
opening so that threaded end comes out of opposite tapered end. Make
sure Throwing Arm (A) is pointing forward (12 o'clock position). Connect
hook end of Mainspring (H) through hole in Swivel Yoke. Put threaded end
of Hex Bolt (N-8) through hole in Rear Bracket. Add the Nylon Shoulder
Washer (N-14), 10MM Flat Washer (N-9), and 10MM Hex Nut (N-11) and
finger tighten. Adjustment of Mainspring tension for throwing targets will
 
be done later.
Washer  
Cotter   P in  
Trap   A rm   F aces   F orward  
3/8-­‐16   x   4 "   l g.  
Hex   B olt   ( N-­‐8)  
Swivel   Y oke  
10MM X 125MM
Lg, Hex Bolt (N-8)
Mainspring  
Assembly   ( H)  
Rear   B racket  
 
Flight   C ontrol  
Rail   ( G)  
Throwing   A rm   ( A)  
3/8-­‐16   x   7 /8"   H ex   B olts   ( N-­‐
5)  
10MM X 20MM Hex Bolts (N-5)
Nylon  
Shoulder  
Washer  
3/8"   F lat  
Washer   ( N-­‐
(N-­‐14)  
10MM Flat
3/8" Flat Washer
Washer (N-9)
FIGURE 9
FIGURE   9  
8
Sheet   M etal   S crews   ( N-­‐7)  
Round Head Machine Screws (N-7)
3/8-­‐16   F lange   N uts   ( N-­‐10)  
10MM Flange Nuts (N-10)
Arm   S upport  
FIGURE   7  
 
FIGURE 7
Target   C lip   ( I)  
Throwing   A rm   ( A)  
9)  
(N-9)
3/8-­‐16  
Hex   N ut  
10MM
(N-­‐11)  
Hex Nut
(N-11)
FIGURE   8  
FIGURE 8

Publicité

Chapitres

Table des Matières

Dépannage

loading

Table des Matières