Palazzetti TC 120 Manuel page 54

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4.4
System's plan No. 4
TERMOPALEX WITH FORCED CIRCULATION HEATING SYSTEM
PLAN No. 4
AND SEPARATED BOILER FOR THE PRODUCTION OF SANITARY WATER
Functioning:
The pump1 starts at the threshold A01.
The 3 outputs valve is commutated to the distribution system at the threshold A04
from the Probe2.
The 3 outputs valve with spring return is normally to the boiler
Make sure the accumulation has a security dissipation
Used IN/OUT
SERIGRAPHY
Probe1
Pompa1
Probe2
3 outputs valve
Parameter
C- -
A10
P01
P02
Parameter
A01
A04
I01
I04
Pag.: 54/60
C1: controller
S1
CONNECTORS
Probe1
Pump
Probe2
AUX
INSTALLER'S MENU PARAMETERS' SET (Par. 3.5)
System's configuration
Alarm thermostat
probe: '0' =10K blue; '1' 100K grey
Activation output's AUX (6-7) protection functions
Parameters USER'S MENU (Par. 5.0)
Starting threshold pump 1
Starting threshold 3 outputs valve
Thermostat hysteresis parameter A01
Thermostat hysteresis parameter A04
P1
System's symbol
15 - 16
S1
13 - 14
P1
17 - 18
S2
6 - 7
V1
Description
Description
Cod. 004770370
S2
BOILER
V1:
3 outputs valve
1 2 3 4 5 6 7 8 9 10 11 12 13 14
U.
Min Default
n
C01
°C
60
n
0
n
0
U.
Min
°C
20
°C
50
°K
0
°K
0
HSo
Sanitary
hot water
HSi
Cold
sanitary
water
D
distribution
system
CONFIGURATION
C04
20 19 18 17 16 15
Max
C04
C08
85
90
0
1
0
1
Default
Max
50
70
60
80
2
5
2
5
TC120

Publicité

Table des Matières
loading

Table des Matières