HUUM HIVE HEAT 12 Mode D'emploi page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The sauna stove must be installed on a non-combustible surface
with the required carrying capacity.
Electrical equipment and wiring are not permitted in the safety
areaf the sauna stove.
Power
Room
Table 1
kW
HIVE Heat
12
6-13 m
12/LS
211.9 -
459. 1 ft
Installing Hive Heat 12
The furnace bushing of the sauna stove must be made through a
non-combustible wall (stone, concrete, etc.).
The furnace bushing of the sauna stove must be made through
a non-combustible wall (stone, concrete, etc.) that extends 600
mm / 23.63 in to the sides of and 1,400 mm / 55.1 in above the
opening.
It is advisable to leave a 50 mm / 2 in air gap between the bushing
and thestove; therefore, add 100 mm / 4 in to height
C
given in table 1 when calculating the dimensions for the open-
ing.
If the floor in front of the furnace is made from combustible
material, fire-resistant floor protection must be installed in front
A
B
inches
170 mm
500 mm
3
6.7 in
19.7 in
3
LS
to be heated from another room
C
D
inches
inches
inches
240 mm
425 mm
5 mm /
155 mm
0.2 in /
9.5 in
16.8 in
16. 1 in
E
F
Ø
inches
inches
300 mm
450 mm
450 mm
11.9 in
/17.8 in
17.8 in
D
and width
H
inches
750 mm
29.6 in
5

Publicité

Table des Matières
loading

Table des Matières