Section 4 - Maintenance And Troubleshooting; Routine Maintenance; Circuit Breakers - Hobart Welding Products IronMan 250 Manuel Du Propriétaire

Table des Matières

Publicité

SECTION 4 – MAINTENANCE AND TROUBLESHOOTING

4-1. Routine Maintenance

3 Months
Replace unreadable labels.
6 Months
Blow out or vacuum inside. During
heavy service, clean monthly.

4-2. Circuit Breakers

2
1
Y Disconnect power before maintaining.
Clean and tighten weld terminals.
OR
Repair or replace
cracked weld cable.
Remove drive roll
and apply light coat
of oil or grease to
drive motor shaft.
Y Turn Off unit.
1
CB1 protects main circuit board PC1
if drive motor shorts or fails. If CB1
opens, wire feeding stops. Check for
gun liner blockage or kinks, and check
for jammed wire, or binding drive rolls.
2
CB2 protects the trigger circuit from
overload. If CB2 opens, weld output
stops. Check gun switch, and trigger
leads.
Correct problem. Press button to reset
circuit breaker. Close door.
Circuit Breaker CB1
Circuit Breaker CB2
Ref. ST-802 285-B
OM-192 440 Page 19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

M-25 gun

Table des Matières