Installing Welding Gun; Installing Work Clamp - Hobart Welding Products IronMan 250 Manuel Du Propriétaire

Table des Matières

Publicité

2-5. Installing Welding Gun

2-6. Installing Work Clamp

1
3
2
2
1
4
1
Route cable out front panel opening
from inside.
2
Connect cable to terminal.
3
4
Route cable through clamp handle
and secure as shown.
Close door.
3
4
Tools Needed:
1/2, 3/4 in
1
Drive Assembly
2
Gun Securing Knob
3
Gun End
Loosen knob. Insert gun end
through opening until it bottoms
against drive assembly. Tighten
knob.
4
Gun Trigger Plug
Insert plug into receptacle, and
tighten threaded collar.
Close door.
Ref. ST-802 285-B
Work Cable
Negative (–/Black) Output
Terminal
Hardware
Work Clamp
Ref. ST-802 285-B / Ref. ST-801 566
OM-192 440 Page 11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

M-25 gun

Table des Matières