Safety Guidelines; Technical Data; Options; Assembly - resideo Braukmann VE300S Instructions D'installation

Recharge
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
1

Safety Guidelines

1.
Follow the installation instructions.
2.
Use the appliance
• according to its intended use
• in good condition
• with due regard to safety and risk of danger.
3.
Note that the appliance is exclusively for use in the
applications detailed in these installation instructions
(see 2 Technical Data). Any other use will not be
considered to comply with requirements and would
invalidate the warranty.
4.
Please take note that any assembly, commissioning,
servicing and adjustment work may only be carried
out by authorized persons.
5.
Immediately rectify any malfunctions which may
influence safety.
Treated water has changed chemical corrosion parameters.
Above and beyond these water treatment measures, the right
planning, installation, commissioning and operation of the
heating system in line with relevant standards and/or Resideo
requirements must be ensured.
If the drinking water is heated via the heating circuit, with
category 4 or 5 liquids, any elements making contact must
also have double walls. Demineralised water corresponds to
category 2 in accordance with EN 1717 Appendix B.
Water drawn from the bleeder valve must not be used as
drinking water.
2

Technical Data

Media
Medium:
Connections/Sizes
Connection size Inlet:
Connection size Outlet:
Pressure values
Max. inlet pressure:
Operating temperatures
Max. operating temperature
medium:
Max. device temperature with
shut-off valve (closed) due to
transfer of temperature of
heating system:
Max. ambient temperature:
MU1H-1564GE23 R0420
Water
1
/
" internal thread adapter
2
3
for union nut
/
"
4
3
/
" external thread
4
6 bar
30 °C
50 °C
40 °C
GB
Specifications
Installation position:
For softening:
For complete
demineralisation:
Battery life:
3

Options

For Options visit homecomfort.resideo.com/europe
4

Assembly

It is necessary during installation to follow the installation
instructions, to comply with local requirements and to follow
the codes of good practice.
4.1 Installation Guidelines
Installation in heating system intake
Install at height of at least 610 mm from the ground to
ensure that cartridges can be replaced
Downstream of the heatwater treatment unit
(VE300S), provide settling section of at least 500 mm
before integration in the heating circuit
Install in horizontal pipework with cartridge connection
directed downwards
The installation may not take place in areas or ducts
where poisonous gases or vapours may be present or
where flooding can occur
The installation environment should be protected
against frost and ventilated well
The installation location has to be easily accessible
– Simplified maintenance and cleaning
According to EN 1717 in direction of flow, first install
the refilling combination (NK300S) and directly after it,
the heatwater treatment unit (VE300S)
The national installation regulations must be observed
during the assembly
If installing without a refilling combination (NK300S)
upstream of the heatwater treatment unit (VE300S),
provide a shut-off fixture
3
Horizontal pipework with
cartridge connection facing
downwards. Size of the
cartridge has to be
considered.
Suitable for heating systems
with the following materials:
aluminium, aluminium alloys,
steel, copper, copper alloys
and plastics.
Suitable for heating systems
with the following materials:
steel, copper, copper alloys
and plastics.
5 years

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Braukmann ve300s-1/2a

Table des Matières