Delta MultiChoice 17T Serie Manuel Du Propriétaire page 7

Masquer les pouces Voir aussi pour MultiChoice 17T Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

B-4
4
1
Temperature handle Installation
Turn on water supplies; LET THE WATER RUN AT BOTH FULL HOT AND FULL COLD TO ENSURE THE WATER IS
RUNNING AS HOT/COLD AS POSSIBLE.Place the temperature handle (1) onto the spline, then rotate the temperature
handle until you achieve your maximum desired temperature from the outlet (not more than 120° or the lower temperature
mandated by your local plumbing code). Then take off the temperature handle and assemble it onto the spline again to make
sure the temperature handle limit stop (2) hits against the volume handle limit stop (3) as shown. Install temperature handle
with set screw (4), cover set screw with handle button (5).
Potential scald or thermal shock injury could result due to cross flow if outlet at the shower is blocked or
5
restricted (e.g., pause control on showerhead). Be sure to point showerhead away from you when re-
starting flow or install inlet check valves on both supply lines to prevent possible injury.
5
7
3
2
107530 Rev. C

Publicité

Table des Matières
loading

Table des Matières