Operation Checklist - Monogram PHP900 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CHECKLISTS
PRE-TEST CHECKLIST
1
A
Remove all protective film, if present, and any
stickers.
Check to be sure that all wiring is secure and
B
not pinched or in contact with moving parts.
C
Check level of appliance.
D
Check that the cooktop is properly grounded.
Installation Instructions
10

OPERATION CHECKLIST

2
A
Remove all items from the top
of the cooktop surface.
Turn on the power to the cooktop.
B
(Refer to your Owner's Manual.) Verify that all
surface burners operate properly.
Check that the circuit breaker is not tripped
C
nor the house fuse blown.
D
Check that conduit is securely connected to
the junction box.
See Owner's Manual for troubleshooting list.
E
NOTE TO ELECTRICIAN:
The power leads supplied with this appliance are
UL recognized for connections to larger gauge
household wiring. The insulation of these leads
is rated at temperatures much higher than the
temperature rating of household wiring. The
current carrying capacity of a conductor is
governed by the wire gauge and also the
temperature rating of the insulation around
the wire.
NOTE: ALUMINUM WIRING
• WARNING:
IMPROPER CONNECTION OF ALUMINUM
HOUSE WIRING TO THE COPPER LEADS CAN
RESULT IN A SERIOUS PROBLEM.
• Splice copper wires to aluminum wiring
using special connectors designed and UL
approved for joining copper to aluminum
and follow the manufacturer's recommended
connector procedure closely.
NOTE: Wire used, location and enclosure of
splices, etc., must conform to good wiring
practice and local codes.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zhu30

Table des Matières