TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape
measure
Electric drill with 1/8" and 3/8" bits
Spirit level
Flashlight
Pliers
Wire Cutter/Stripper
Ladder
Additional Materials:
• 120V 60Hz, 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
• Strain relief for junction box.
• 7" round metal duct or 3-1/4" x 12" rectangular
duct length to suit installation.
12
Installation Preparation
Phillips and Flat blade
Duct tape
screwdrivers
1/4" pivoting hex socket
Safety glasses
UL Listed Wire nuts
Wire Nuts
Hammer
Tin Snips
Saber saw or Key Hole Saw
Allen Wrench
REMOVE THE PACKAGING
Wood
Mounting
Motor
Support
• Remove the small box housing the motor.
• Lift the hood out of the box.
• Remove shipping screws holding the wood
mounting piece to the back side of the hood. Set
aside wood mounting piece and screws for later
installation. Do not discard.
• Remove the "V" shaped carton insert.
• Remove parts package from the "V" shaped
cardboard insert.
• Remove junction box cover and knockout.
• Install strain relief onto back or top of hood.
• Remove all tape and packing material from the
hood, duct transition and motor.
Hood
Parts
Package
Shipping Carton
1" = 2.5 cm; 1' = 0.3 m
49-2000061 Rev. 2