Installation And Mounting - Tefcold BLC5-P Guide Rapide

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83
NOTE2: If the end cycle temperature iS3 is not reached in the maximum time Pd1+Pd2+Pd3 the instrument
keep on working, but the alarm message "OCF" is given.

12. INSTALLATION AND MOUNTING

Instruments XB570L shall be mounted on vertical panel, in a 150x31 mm hole, and fixed using two screws
3 x 2mm. To obtain an IP65 protection grade use the front panel rubber gasket (mod. RG-L). The
temperature range allowed for correct operation is 0 to 60°C. Avoid places subject to strong vibrations,
corrosive gases, excessive dirt or humidity. The same recommendations apply to probes. Let the air circulate
by the cooling holes.
12.1 CUT OUT
12.2 MOUNTING
1592006207 XB570L GB r1.1 26.08.2015
Ø3 x2
165
+1
-1
150
+0.5
-0
XB570L
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Blc10-pBlc14Blc3-p

Table des Matières