Auto-Shut Off Function - Telefunken HappyCare HCASF-1 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 1
Plug your steam iron into a wall
socket then select your desired
temperature setting.
Step 4
The
charging
time
secondes, when it is over the
charging light indicator (Z1) will
switch to fix green light showing
the iron is ready to use. And the
heating light indicator (Z2) will
shut off to indicate the iron has
reached
the
temperature to iron.
Do not touch hot soleplate at any time before cooling down! Never direct the steam
WARNING:
at people! The supply cord may become hot during a long ironing session. Do not place the iron on
a metal support when in use as it may damage the soleplate, always place the iron on the silicone
support as it's equipped with thermal insulation cushion designed to withstand high temperature.
Place the iron in the right
position horizontally to the
charging base.
is
50
After 25 secondes of use, the
charging base will produce 2
"beep" and flashing red to
indicate the iron has to be
placed back on its base for
charging. And will switch to fix
green light when the charging
selected
time is over after 50 secondes of
charging.
Step 2
Step 5
Step 3
The charging light indicator (Z1)
will flash green to indicate that
the iron is well positioned into
the base and in the process of
charging. The heating light
indicator (Z2) will keep lighting
to indicate the iron is rising to
the selected temperature.

AUTO-SHUT OFF FUNCTION:

When not in use over 2
minutes, the charging base will
produce
6
"Beeps"
charging light indicator will
keep flashing red indicating the
iron is not anymore on charge in
the base.
To heat up the iron again, just
remove it and put it back on the
charging base.
ENGLISH
and
10

Publicité

Chapitres

Table des Matières
loading

Table des Matières