Before Installation - Axis Communications 215 PTZ-E Guide D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Page 4
Overview

Before installation

Before Installation, it is important to remove all
packing material from the camera according to
the steps below. Do not start the camera until all
packing has been removed, or the camera will be
damaged.
1. Place the AXIS 215 PTZ-E network camera on
a clean, solid surface.
2. Loosen the four screws holding the dome
(using the 3mm allen key). Make sure the
o-ring on the screw is in place.
3. Carefully unwrap the AXIS 215 PTZ-E.
4. Carefully remove the packing between the housing and sunshield. See illustration above.
5. Remove the plastic protection
from the desiccant bags.
6. Fold the ends of the desiccant
bags and place them in the
empty slots.
7. Attach the dome and tighten
the four screws firmly.
Wall bracket
screws
Sunshield
screws
Sunshield
Dome
Place desiccant bag here
AXIS 215 PTZ-E Installation Guide
Wall bracket
Packing between housing
and sunshield
Place desiccant bag here
Screws for dome

Publicité

Table des Matières
loading

Table des Matières