Initial Operation - Buhnen HB 196 Traduction Du Mode D'emploi Original

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
Operation
Attention!
Observe the following instructions to prevent the risk of
injuries and damage to the device:
1. Never lay down the device on its side in its hot operative
2. Never remove adhesive residues from the melting
3. Never loosen "frozen" hot-melt adhesive candles by
4. You should never pull the old adhesive candle out of the
5. Never use the trigger (3) with force.
6. Comply with the processing data sheet of the hot melt
7. When working upside down, watch out for possible drips
8. Always disconnect the mains plug before carrying out
4.1

Initial operation

1. Plug the mains plug into a protective earth conductor outlet.
2. Switch on the device at the on/off switch (5).
3. Please wait a further 6 - 8 minutes before starting.
HB196XM_180730.indd 16
state. This could cause the filling material to leak un-
checked. Danger of burns!
chamber by force (e.g. with a scraper or screwdriver).
This could damage the interior lining of the melting
chamber.
force (e.g. with tongs).
device. This can cause damage to the transport mecha-
nism.
adhesive (protection against processing errors).
to avoid burns to personnel or work items.
any work on the device (maintenance, cleaning).
16
GB
19.09.18 14:44

Publicité

Table des Matières
loading

Table des Matières