Initial Operation - Noritz N-132M Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Initial Operation

Before the first use of your water heater, make the following preparations.
1 through 4
Follow steps
1
Open the water supply valve.
CLOSED
2
Open a hot water fixture to confirm that
water is available, and then close the
fixture again.
3
Open the gas supply valve.
4
Turn on the power.
.
OPEN
Hot water fixture
11

Publicité

Chapitres

Table des Matières
loading

Table des Matières