Preparing The Installation - Bose Professional II Série Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
Setup

Preparing the Installation

Loudspeaker Placement
Note: Installation in close proximity to cooking surfaces where the loudspeaker may be directly exposed to cooking oils, steam, vapor, or
high heat such as in commercial cooking environments may decrease the performance or reliability of the loudspeaker.
Using a Safety Cable
Some regional construction codes require the use of a secondary method of securing loudspeakers to support structures to provide
additional safety. Choose a mounting position, method, and hardware consistent with local building codes and regulations.
Bose recommends using a safety wire or a safety cable as a secondary securing mechanism for the Series II Acoustimass bass module
and Flush-mount Satellites. Follow the manufacturer's instructions for any secondary securing mechanism implemented.
Each loudspeaker model has one or more possible attachment points:
Series II Acoustimass Bass Module
Flush-mount Satellites
Preparing the Ceiling & Accessories
Before installing a bass module or satellite loudspeakers, follow the instructions to prepare the ceiling and any accessories you will use in
the installation. See Installation Options (Page 5) for a list of required or optional accessories for each loudspeaker model.
Preparing Acoustic Ceiling Tile
Cutting the Ceiling Tile
1.
Remove the tile and use the template to trace a loudspeaker hole onto the tile. To center the template on the tile, draw an X by
connecting the corners diagonally and center the template using the crossing point.
2.
Cut a hole into the tile.
q
Installing the Tile Bridge
1.
Place the tile bridge across the ceiling grid. If necessary, adjust the tile bridge so the rails rest on the ceiling grid.
2.
Replace the tile in the ceiling.
q
Preparing Hard Ceiling Using a Rough-in Pan (New Construction)
1.
Attach rough-in pan to the ceiling furring or wood studs. The rough-in pan includes multiple pre-drilled holes to accommodate
different stud spacing, loudspeaker orientations, and loudspeaker placements.
2.
After the ceiling is finished, cut a hole in the finished ceiling, using the rough-in pan as a guide.
q
8 • English
Remove an M6 screw from the rear cover plate, and attach a safety cable to that screw hole.
Attach a safety cable to the opening in the metal tab on the rear cover plate.
w
w
w
FreeSpace 3 Loudspeaker System • Installation Guide
PRO.BOSE.COM

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Freespace 3

Table des Matières