Zephyr Siena Pro Island Guide D'utilisation, D'entretien Et D'installation page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Top Support Frame
Top Duct Covers
Bottom Duct Covers
Bottom Support Frame
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
5. Attach junction box to lower support frame lateral bracket by (2) M4 x 8mm screws. (FIG. E) Secure
junction box wire from hood to junction box to support frame arm by (2) zip ties.
6. Attach collar adaptor to top of hood body by (4) M4 x 8mm screws. Attach 10" round duct collar to collar
adaptor by (4) M4 x 8mm screws. Install electrical and duct work. Seal duct work with aluminum duct tape.
7. Power up hood, verify all functions and check for leaks around duct tape.
8. Assemble Top Duct Covers (with louver holes) together over Top Support Frame, secure Top Duct Covers
together by magnetic strips
9. Secure Top Duct Covers to Top Support Frame by using (4) 3/16 x 1/4 screws (2 screws for each Top Duct
Cover). (FIG. D1).
10. Assemble Bottom Duct Covers together over Top Duct Covers and secure together by magnetic strips.
Bottom Duct Covers should rest on top of the Hood Body.
1
FIG. D
10
www.zephyronline.com
FIG. E
FIG. F

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zsl-e42bsZsl-e48bsSiena pro island zsl-e42bsSiena pro island zsl-e48bs

Table des Matières