4.3

Assembly

The boiler can be hung to the wall using :
the wall suspension strip and a the connection kit EKVK4AA
a B-pack including an expension vessel and a connection kit.
4.3.1
Assembling suspension strip and assembly bracket
Make sure the construction of the wall is suitable for hanging the boiler.
Drill the holes for the suspension strip and the connection kit in the wall
using the template delivered with the boiler.
Mount the suspension strip and the assembly bracket horizontally on the
wall, using the associated attachment materials.
Place the filling loop on the connections of the return and cold water nipple
following the connection kit installation instruction
The boiler can now be placed on the suspension strip simultaniously sliding
the pipes of the boiler into the valves in the assembly bracket.
4.3.2
Assembling B-pack
Make sure the construction of the wall is suitable for hanging the boiler and
B-pack.
Drill the holes for the B-pack kit in the wall using the template delivered
with the boiler.
Mount the B-pack on the wall using the associated attachment materials.
Place the assembly bracket in the frame as described in the manual
inclued in the B-pack.
Connect the flexible hose on the expension vessel and the conenction on
the return valve. Make sure the seal rings are placed !
Place the filling loop on the connections of the return and cold water nipple
following the connection kit installation instruction
The boiler can now be placed on B-pack simultaniously sliding the pipes of
the boiler into the valves in the assembly bracket