Kohler K-1188 Guide D'installation page 67

Masquer les pouces Voir aussi pour K-1188:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Finished Floor
1. Prepare the Site
NOTICE: Provide adequate floor support.
NOTICE: Measure your product for site preparation. Visit the product page at www.kohler.com for more
information.
Determine the location of the bath.
Make sure the subfloor offers adequate support for your bath.
Ensure the subfloor is level.
IMPORTANT! To ensure a successful installation, it is critical that you install the bath on a level finished
floor.
Install the finished floor material.
Make sure the finished floor is level before proceeding.
Position and install a standard PVC or brass bath drain pipe. Install the drain pipe so it extends
2-1/8" (54 mm) above the finished floor.
Kohler Co.
Drain
Pipe
3
2-1/8"
(54 mm)
1207308-2-A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1189

Table des Matières