Connect Supply Lines and Fixture
Check for leaks by pressurizing
unit SLOWLY.
Check the temperature when approx. 3-5 GPM
water flow is reached (equivalent to one eye wash
or face wash) and adjust if necessary.
When the check stops are in the fully open
(opera ting) position, the stem will extend
approximately 1/2" (13mm) from the stem nut.
3
Adjust Temperature with Water Running
Check the temperature when approximately 3 – 5 GPM
water flow is reached (equivalent to one eye wash).
This device must be checked for final temperature and adjusted as
necessary. The standard preset factory temperature setting is 85°F
(29°C) [the range of the valve is 65°F–90°F (18°C–32°C)]. Insert
Allen Wrench through the hole in the cap and into the set screw
to adjust. Consult proper medical and/or safety authorities for the
optimum temperature recommended for your particular application.
4
Test Unit
Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off,
check to make sure the cold water continues to flow. If the cold water is flowing properly, reopen the hot water supply.
Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off,
check to make sure that the hot water flow has shut down to less then 0.5gpm. If hot water is shut down, fully reopen cold
water supply.
Test the system weekly (turn on the water supply and check for constant control of the desired set temperature).
4
Open
Close
S19-2000 Shown
DO NOT SKIP THIS STEP!!!
7/18/2012
Tempered Water
(to Fixture)
Hole In Cap
Stem
HOT
Stem Nut
5/64" Allen Wrench
H
Bradley • 215-1291 Rev. N; EN 12-09-002
Installation
COLD
C

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S19-2000efx série

Table des Matières