Important - Bradley S19-2000 Série Installation

Masquer les pouces Voir aussi pour S19-2000 Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19-2000, S19-2000EFX
Installation
Packing List
IS
T H
E
S ID
U P
Supplies recommended for installation
Lockable shut-off on the outlet if tempered water is supplied to one or more emergency fixtures
Lockable shut-off on the inlets/supplies
(6) 1/4" wall anchors and fasteners for surface-mounted cabinet
(4) 1/4" fasteners (and wall anchors, if necessary) for recess-mounted cabinet
Unions on all connections to facilitate removal of valve
Tools required for temperature adjustment
5/64" Allen wrench
Blade screwdriver
1
Install Optional Cabinet (If not installing cabinet, skip to Step 2)
If installing S19-2000EFX into Dropdown Eyewash Cabinet S19-292,
please see mounting instructions supplied with cabinet.
Recessed Cabinet:
1. Rough-in wall opening 11-1/2" W x 13" H.
2. Insert the cabinet and secure to wall with four 1/4" fasteners
properly anchored (supplied by installer.)
3. Install two anchors and screws through the valve bracket in
back of the cabinet into a secure brace (supplied by installer) or
into wall. This will support the valve.
4. Install the valve nipples and one-half of the union ball valve
using pipe sealant or teflon tape. Install the other half of the
union ball valve onto inlet and outlet pipe.
5. Insert the valve into the bracket in the cabinet (right side goes
in first). Continue with the valve installation procedure.
6. Position the wall flange tight to the wall and caulk in place.
2

IMPORTANT!

Read this entire installation manual to ensure proper installation. When
finished with the installation, file this manual with the owner or maintenance
department. Compliance and conformity to local codes and ordinances is
the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for
before discarding packaging material. If any parts are missing, do not begin
installation until you obtain the missing parts.
Valve should be accessible for testing, adjusting and maintenance in the
installed position.
Make sure that all water supply lines have been flushed and then completely
turned off before beginning installation. Debris in supply lines can cause
valves to malfunction.
Product warranties may be found under "Products" on our web site at
bradleycorp.com.
7/18/2012
Surface-Mounted Cabinet:
1. Measure and mark the cabinet mounting hole locations
at the dimensions shown on next page. Install six 3/8" wall
anchors (supplied by installer).
2. Position the cabinet onto the wall and secure into place
with six 3/8" wall fasteners (supplied by installer).
3. Install the valve nipples and one-half of the union ball
valve using pipe sealant or teflon tape. Then install the
other half of the union ball valve onto the inlet and outlet
piping.
4. Insert the valve into the bracket in the cabinet (right
side of the valve goes in first). Continue with the valve
installation procedure.
Bradley • 215-1291 Rev. N; EN 12-09-002
Installation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S19-2000efx série

Table des Matières