Omcan CE-CN-G15M Manuel D'instructions page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Combustible clearances:
6" sides (152mm).
6" rear (152mm).
4" floor (102mm).
Noncombustible clearances:
0" sides (0mm).
0" rear (0mm).
4" floor (102mm).
Do not obstruct the flow of combustion and ventilation air, under the unit by the legs or behind the unit by
the flue. Adequate clearance for air openings into the combustion chamber is required. Do not place objects
between the bottom of the unit and the counter top. There must be adequate clearance for removal of the front
panel. All major parts except the burners are removable thru the front if the gas line is disconnected.
CONVERSION
These instructions are for the conversion from Natural Gas to Propane (L.P.) on all models. The conversion
should be done before connecting the unit to the gas supply. Units are shipped from the factory equipped for
use on natural gas.
1. Shut-off the main isolation gas valve and follow the lock-out/tag-out procedure.
8

Publicité

Table des Matières
loading

Table des Matières