H95144006 - H95144015
INSTALLATION
Take the product out of the packaging and place
it on a suitable surface: we suggest to use a soft
material like a sponge or a cloth. This information
is very important for the creation of the plasterbo-
ard structure. The installation entails the lowering
of the plasterboard ceiling, as the appliance shall
be installed at a maximum distance of 2100 mm
from the floor, in order to ensure good operation
and performances.
The hood can be installed at a minimum distance
of 300mm and at a maximum distance of 480mm
from the solid ceiling.
In case ceiling lowering results greater than the
aforementioned maximum distance required, you
will need to use longer threaded bars.
In order to make installation operations easier,
we suggest to create only the metal structure clo-
se to the hood, without using the plasterboard.
Please remember that the recess which will hou-
se the hood should be 865x405 mm and that the
weight of the plasterboard shall not rest on the
hood. Provide the area where the hood is being
installed with power supply and with the 150mm
diameter or similar section duct necessary to di-
scharge the air.
The appliance has the motor air outlet positioned
on its short side; nevertheless you can choose
the side of the hood from which collected air is
to be discharged and you can do it as follows:
open the panel, following the instructions given
in the "USAGE" section and remove the grease
filters. Remove the 4 screws of the motor plate as
shown in figure 16. Remove the lid of the side in
which you wish to place the air outlet, as shown
in figure 21. Place the motor on the chosen side
and close the hole with the lid you previously re-
moved, fig. 22.
7