Ozone
Outlet Barb
Injector Assembly
2D-4. Flow Test - Refer to Figure 3.
1. Install Tube Adapter on injector. Use Teflon thread tape as needed.
2. Connect the end of the Ozone Tube with the check valve installed
onto the Tube Adapter with the tube clamp provided.
3. Connect the longer end of the Flow Meter Assembly to the Ozone
Outlet Barb.
4. Connect the remaining ends of the Ozone Tube and the Flow Meter
Assembly together.
5. Hold the Flow Meter Assembly so that the clear plastic chamber is
vertical with the longer tubing toward the bottom.
6. Turn on the pool's circulation system as this allows the Injector
Assembly to pull a vacuum. Under normal operation, the ball in the
Flow Meter Assembly will be floating in between its Max and Min
line. Under worst-case system conditions the flowmeter ball should
indicate at least a small amount of air flow. Flow may be adjusted
as described below.
Adjustable Injector Manifold: Gas flow can be controlled by
adjusting the Valve on the Manifold. Close the valve to increase gas
flow, open the Valve to decrease gas flow.
Rigid Injector Manifold: This Manifold is equipped with a
DELCheck
spring loaded valve. It cannot be adjusted, but provides
TM
a wide operating range. If more gas flow is necessary, verify that other
valves in the system are not inhibiting flow through the Manifold. If you
Eclipse
System
Flow Meter Assembly
(Remove after testing)
Figure 3: Flow Test Assembly
5
Eclipse Installation & Operations Manual
Ozone Tube
Check Valve
Tube Adapter
4-2162-01 Rev.E