Installation guide for the 4 holes bath faucets KS, QS, ZO, TM & TQ se-
Important: For the handles' adjustment, rotate the cartridge in the closed posi-
tion (cold side turned counter-clockwise, hot side turned clockwise).
A. On each spindle (7), put a set including: a nut (10), a washer (9), and a gasket (8).
Insert each spindle (7) from underneath the worktop, into the proper holes. Screw
the spindles' nut (10) all the way for the final adjustment.
B. Onto the worktop, insert the o-ring (6) and screw the decorative ring (5) on the
spindle (7). Use the provided template (32) in order to adjust the spindles' height.
C. Screw, the decorative rings (4) all the way onto the spindle (7) DO NOT OVER
TIGHTEN.
D. From underneath the worktop, insert the diverter (24) into the central hole in be-
tween the handles with a nut (27), a washer (28), and a gasket (29). As for the top,
put a gasket (17), a washer (16), and the diverter's top nut (15).
E. Screw the diverter's top nut (15) all the way and finalize the assembling underneath
the worktop by tightening the nut (27).
F. Insert the spout (14) onto the diverter's top nut (15), making sure the diverter's rod
(24) is well slid into the spout's hole. Screw the set screw (13).
G. Insert the lever (12) onto the diverter's rod (24) and straighten with the tightening
screw (11).
H. Into the remaining hole, insert the deck flange's (21) threaded shaft and the o-ring
(22). From underneath the worktop, insert the gasket (30) and screw the nut (31) all
the way.
I. Screw the hand shower hose's (19) male connection to the hand shower (18), mak-
ing sure the gasket is being used. Slide the decorative flange (20) on the hand
shower hose (19) and screw it to the hand shower (18), then pass the other end
into the deck flange (21).
J. Connect the flexible hoses (23) from the spindles (7) to the diverter (24).
K. Assemble the handles (3) and the handles' caps (1), then adjust handles' position.
For ZO, KS and QS models, install the handle (1), tighten the screw (2), and insert
the screw cap (3). (See Image #1)
L. Finalize the assembling by tightening the nut (10) underneath the worktop. DO
NOT OVER TIGHTEN.
M. Fix together the hand shower hose (19) and the flexible hose (26), making sure the
gasket is being used.
N. Connect the water supplies to the spindles: Hot on the left side and cold on the
right side.
O. Check all joints for leaks.
*The positioning of the gaskets (8) is important. The ridges on them are there to help
center the spindles (7) in the opening. The spindle with marks is for the cold water
side.
Gui-12 rev 11 09/2012
ries
9
KS, QS, ZO, TM & TQ series 4 holes bath faucet
Image #1
ZO, KS & QS
handle
Gui-12 rev 11 09/2012
10
32