060572-025 X Series
L
O W E R T H E
This procedure applies only to the X26N model for the purpose of passing through a standard double
doorway. Guardrails must be returned to proper position before using the machine.
L
OWERING
1. Ensure that the slide-out deck extension is fully retracted and the deck pin is locked. Place the Platform
Controls on the floor of the platform.
2. Remove and retain the set screws from the side guardrails and the slide-out deck guardrails.
3. Lower the slide-out deck guardrail completely.
4. Lower the rear guardrail until it rests on the stop screws.
5. Lower the side guardrails completely.
6. Raise the rear guardrail until the retaining pins engage. Remove and retain the stop screws and nuts
from the rear guardrail.
7. Pull the two retaining pins and lower the rear guardrail completely.
R
AISING
1. Raise the rear guardrail until the retaining pins engage.
2. Install the stop screws and nuts on the rear guardrail and torque to 42 N-m (31 ft. lbs).
3. Pull the two retaining pins and lower the rear guardrail until it rests on the stop screws.
4. Raise the side guardrails until the tops are level with the rear guardrail.
• Install the set screws
5. Raise the slide-out deck guardrail until the top is level with the side guardrails.
• Install the set screws
6. Hang the controller on the slide-out deck guardrail.
7. Torque all set screws to 42 N-m (31 ft. lbs).
W A R N I N G
!
Before operating machine, guardrails must be securely fastened in their proper position.
Page 10
G
U A R D R A I L S
P
ROCEDURE
P
ROCEDURE
, X26N
!
Operation
Operation Manual